
In detail
What it is made of
How it works
Multi-turn electric actuator
Construction
Parts and materials
The multi-turn electric actuator is designed to automate the control of industrial valves and determine the valve shutoff valve position.
The electric actuator operates by converting an electrical signal from the control device into rotary motion of the output shaft.
Technical parameters of multi-turn electric drives DNOVA MT-N-xM-O2-380VAC-U1 380V five-cam, torque 50-900 Nm
| Name | Value |
| Electric Drive Brand | DNOVA |
| Electric Drive Type | Multi-turn |
| Power Voltage | 380V |
| Ambient Temperature, °C | -30 to 70 |
| Enclosure Protection Rating, IP | 67 |
| Manual Override | Steering wheel |
| Explosion Protection | no |
Dimensions and sizes of multi-turn electric drives DNOVA MT-N-xM-O2-380VAC-U1 380V five-cam, torque 50-900 Nm
| Model | 005M | 010M | 015M | 020M | 030M | 045M | 060M | 090M |
| W, mm | 334 | 334 | 334 | 365 | 365 | 433 | 433 | 587 |
| H, mm | 258 | 258 | 258 | 290 | 290 | 337 | 337 | 352 |
| L, mm | 411 | 411 | 411 | 470 | 470 | 564 | 564 | 637 |
| DxD, mm | 100x100 | 100x100 | 100x100 | 122x122 | 122x122 | 200x200 | 200x200 | 200x200 |
| D1, mm | 104 | 104 | 104 | 135 | 135 | 220 | 220 | 220 |
| D2, mm | 70 | 70 | 70 | 108 | 108 | 155 | 155 | 155 |
| d1, mm | 32 | 32 | 32 | 45 | 45 | 70 | 70 | 70 |
| d2, mm | 44 | 44 | 44 | 57 | 57 | 84 | 84 | 84 |
| f, mm | 8 | 8 | 8 | 15 | 15 | 22 | 22 | 22 |
| h, mm | 5 | 5 | 5 | 8 | 8 | 11 | 11 | 11 |
| h1, mm | 3 | 3 | 3 | 7 | 7 | 11 | 11 | 11 |
| h2, mm | 18 | 18 | 18 | 22 | 22 | 28 | 28 | 28 |
| 4–M | 4–M12 | 4–M12 | 4–M12 | 4–M12 | 4–M12 | 4–M20 | 4–M20 | 4–M20 |

Schematic diagram of the multi-turn electric drives DNOVA MT-N-xM-O2-380VAC-U1 380V five-cam, torque 50-900 Nm
| № | Name |
| 1 | Electric Motor |
| 2 | Gear Motor |
| 3 | Worm Gear |
| 4 | Worm |
| 5 | Handle |
| 6 | Torque Mechanism |
| 7 | Set of Disc Springs |
| 8 | Opening Indicator |
| 9 | Movement Mechanism |
| 10 | Output Shaft |
| 11 | Worm Gear |
| 12 | Bevel Gear |

Production. Usually 7–14 business days after you approve the quotation and pay. Made-to-specification items are confirmed in the quotation.
Freight. Not charged at checkout. A manager quotes air and sea freight to your port or airport, and nothing ships until you approve the price and the freight.
To North America. From approval and payment to the destination port or airport: air 14–24 days, sea 32–60 days. Estimates, not guarantees.
Terms. EXW Ningbo or FOB Ningbo Port; CIF on request. The agreed term is written on the Proforma Invoice.
Total items
Product subtotal