
How it works
Quarter-turn lever
Two-way ball valve
Construction
Parts and materials
The ball valve is used as a shut-off valve in heat and water supply systems, in steam, fuel and pneumatic systems with compressed air and neutral gases. Installation of valves of this series is possible in systems transporting liquid and gaseous media (water, oil, oils, steam, air, alcohols, glycol, etc.) that are not aggressive to valve materials.
Dimensions and dimensions of ball valves DNOVA BV3131P(3pc)-FP-W-H stainless steel SS304, full bore, three-piece, seal - PTFE, welded, with handle
| Model | d, mm | D, mm | B, mm | H, mm | L, mm | E, mm |
| DN10 | 12 | 17.2 | 2.1 | 50 | 130 | 120 |
| DN15 | 15 | 21.3 | 2.1 | 55 | 150 | 120 |
| DN20 | 20 | 26.9 | 2,1 | 66 | 155 | 135 |
| DN25 | 25 | 33.7 | 2.8 | 71 | 186 | 160 |
| DN32 | 32 | 42.4 | 2.8 | 81 | 195 | 170 |
| DN40 | 38 | 48.3 | 2.8 | 87 | 231 | 190 |
| DN50 | 50 | 60.3 | 2.8 | 91 | 243 | 220 |
| DN65 | 64 | 76.1 | 3 | 119 | 290 | 280 |
| DN80 | 76 | 88.9 | 3 | 125 | 302 | 280 |
| DN100 | 100 | 114.3 | 3 | 159 | 326 | 330 |
| DN125 | 125 | 141.3 | 3.4 | 186 | 360 | 330 |
| DN150 | 150 | 168.3 | 3.4 | 207 | 390 | 330 |

Sketch of dimensions and dimensions of ball valves DNOVA BV3131P(3pc)-FP-W-H stainless steel SS304, full bore, three-piece, seal - PTFE, welded, with handle
Parts and materials table for ball valves DNOVA BV3131P(3pc)-FP-W-H stainless steel SS304, full bore, three-piece, seal - PTFE, welded, with handle
| № | Part name | Material |
| 1 | Case | stainless steel 304 |
| 2 | Side element (2 pcs) | stainless steel 304 |
| 3 | Char | stainless steel 304 |
| 4 | Ball seal | PTFE |
| 5 | Stem seal | PTFE |
| 6 | bushing | stainless steel 304 |
| 7 | Stem | stainless steel 304 |
| 8 | Washer | stainless steel |
| 9 | Nut | steel A2-70 |
| 10 | Bolt | steel A2-70 |
| 11 | Handle | stainless steel |
| 12 | Handle coating | PVC |
| 13 | Nut | steel A2-70 |

Detail and material sketch of ball valves DNOVA BV3131P(3pc)-FP-W-H stainless steel SS304, full bore, three-piece, seal - PTFE, welded, with handle
Production. Usually 7–14 business days after you approve the quotation and pay. Made-to-specification items are confirmed in the quotation.
Freight. Not charged at checkout. A manager quotes air and sea freight to your port or airport, and nothing ships until you approve the price and the freight.
To North America. From approval and payment to the destination port or airport: air 14–24 days, sea 32–60 days. Estimates, not guarantees.
Terms. EXW Ningbo or FOB Ningbo Port; CIF on request. The agreed term is written on the Proforma Invoice.
Total items
Product subtotal