
How it works
Spring check valve
The number that matters
Nominal pressure
16bar
The pressure class of the valve body at 20 °C. Working limits depend on the medium and its temperature.
Construction
Parts and materials
Applications
Media and industries
- Water
- Air
- Oil Products
- Water Supply
Check valve is a device in a pipeline that allows fluids or gases to flow in only one direction. When the pressure of the fluid or gas in the pipeline exceeds a certain value, the valve opens, allowing the substance to pass through. However, when the pressure drops or tries to move in the opposite direction, the valve closes, preventing backflow. Check valves are widely used in various industrial and commercial applications to ensure safety and control the flow in pipeline systems.
Dimensions of the spring check valve DNOVA VCS3232P-T, body material - stainless steel AISI 316

Sketch of spring check valve DNOVA VCS3232P-T, body material - stainless steel AISI 316, closure element material - stainless steel AISI 316, seal - PTFE
| DN | D | L | Weight |
| mm | kg | ||
| 15 | 14 | 61 | 0.1 |
| 20 | 20 | 65 | 0.2 |
| 25 | 25 | 78 | 0.3 |
| 32 | 32 | 88 | 0.5 |
| 40 | 36 | 100 | 0.6 |
| 50 | 50 | 110 | 1 |
Spring check valve specification DNOVA VCS3232P-T, body material - stainless steel AISI 316

Material sketch of spring check valve DNOVA VCS3232P-T, body material - stainless steel AISI 316, closure element material - stainless steel AISI 316, seal - PTFE
| № | Part name | Material |
| 1,3 | Body | CF8/CF8M steel |
| 2 | Gasket | PTFE |
| 4 | Disk | steel SS304 / SS316 |
| 5 | Spring | steel SS304 / SS316 |
- Body material
- Stainless steel AISI 316
- Maximum allowable temperature
- 230 °C
- Connection type
- Threaded NPT/BSP
- Operating environment
- Water, Air, and Oil Products
- Applications
- Water Supply
- Nominal pressure
- 16 bar
- Type of seal
- PTFE
- Locking material
- Stainless steel AISI 316/1.4401
- Check valve type
- Spring
- Country of origin
- China
Production. Usually 7–14 business days after you approve the quotation and pay. Made-to-specification items are confirmed in the quotation.
Freight. Not charged at checkout. A manager quotes air and sea freight to your port or airport, and nothing ships until you approve the price and the freight.
To North America. From approval and payment to the destination port or airport: air 14–24 days, sea 32–60 days. Estimates, not guarantees.
Terms. EXW Ningbo or FOB Ningbo Port; CIF on request. The agreed term is written on the Proforma Invoice.
Total items
Product subtotal