
How it works
Electric quarter-turn actuator
Construction
Parts and materials
Quarter-turn electric actuator DNOVA 005-060 24V is designed for remote and local control of valves. It is widely used in the gas, oil, metallurgical and food industries, housing and communal services, etc. with ambient temperature from -4…+158°F. The housing has the following degrees of protection: IP67, NEME 4 and 6, anti-corrosion coating. Mounting dimensions comply with the international standard ISO05211 / DIN3337. The electric drive is equipped with a squirrel-cage induction motor, automatic position locking of the electric drive, mechanical handle, thermal protection, vibration protection X Y Z 10g (0.2-34 Hz, 30 minutes) and is designed for operation in intermittent duty S2. Actuator stroke 90° with adjustment range ±10°. Restriction of the course of the electric drive - trailer switches. Power is supplied by a constant voltage of 24 V.
Overall and installation dimensions of the actuator DNOVA 005-060 24V
| Model | L | H | A |
| QT-003 | 140 | 118 | 109 |
| QT-005 | 166 | 122 | 118 |
| QT-008 | 200 | 128 | 133 |
| QT-010 | 200 | 128 | 133 |
| QT-015 | 200 | 128 | 133 |
| QT-020 | 269 | 155 | 174 |
| QT-030 | 269 | 155 | 174 |
| QT-040 | 269 | 155 | 174 |
| QT-060 | 269 | 155 | 174 |
| QT-080 | 268 | 212 | 164 |
| QT-100 | 309 | 178 | 200 |
| QT-200 | 309 | 178 | 200 |

Dimensional sketch of the actuator DNOVA 005-060 24V
Drive design DNOVA 005-060 24V
| № | Part name |
| 1 | output shaft |
| 2 | cable lock |
| 3 | mechanical stop |
| 4 | hand wrench |
| 5 | body |
| 6 | cover |
| 7 | viewing window |
| 8 | dust protection |

Drive detail sketch DNOVA 005-060 24V
- Actuator cycle time
- 30s
- Explosion-proof
- No
- Thermal protection
- No
- Type of electric actuator
- Quarter-turn
- Feedback sensor
- Limit switches
- Control signal
- ON/OFF
- Shaft shape rod
- 13 mm
- Shaft shape square
- 14х14 mm
- ISO - flange type
- F05,F07
- Rated current consumption
- 0.5 A
- Power consumption
- 10 W
- Supply voltage
- 24 V
- Country of origin
- China
Production. Usually 7–14 business days after you approve the quotation and pay. Made-to-specification items are confirmed in the quotation.
Freight. Not charged at checkout. A manager quotes air and sea freight to your port or airport, and nothing ships until you approve the price and the freight.
To North America. From approval and payment to the destination port or airport: air 14–24 days, sea 32–60 days. Estimates, not guarantees.
Terms. EXW Ningbo or FOB Ningbo Port; CIF on request. The agreed term is written on the Proforma Invoice.
Total items
Product subtotal