Skip to product information
1 of 10

Parts

Electric actuator

QT 220V

SKU D300-04906
Regular price $25.06 USD
Regular price Sale price $25.06 USD
Sale Sold out
Taxes included. Freight is quoted by our manager after you order; nothing ships until you approve it.
Request a quote
View full details

How it works

Electric quarter-turn actuator

Electric quarter-turn actuator: Closing
ClosingThe motor turns towards the closed end position.
Electric quarter-turn actuator: Opening
OpeningThe motor turns towards the open end position.

Electric quarter-turn actuators are designed for remote and local control of shut-off pipeline valves having a quarter-turn shut-off valve. They are used in various branches of national economy: in gas, oil, metallurgy, food industry, housing and communal services, etc. The actuators are installed directly on pipeline valves. The mounting dimensions comply with the international standard ISO 5211. Four microswitches are used to limit the output shaft travel to the end positions of the valve actuator. The actuators are designed for operation in repeated-short-time mode S2 with a switching time of 10 minutes.



Main technical characteristics:

Actuator model Nominal current, A Nominal power, W Torque, Nm Cycle time (rotation by 90°), sec
QT-003 0,2 20 30 5-15
QT-005 0,24 15 50 20
QT-008 0,32 30 80 25
QT-015 0,35 30 - 25
QT-020 0,48 90 - 45
QT-060 0,92 90 - 45
QT-100 1,2 100 - 45



Actuator cycle time
20s
Explosion-proof
No
Thermal protection
No
Type of electric actuator
Quarter-turn
Feedback sensor
Limit switches
Control signal
ON/OFF
Shaft shape square
11х11mm
ISO - flange type
F03,F05
Rated current consumption
0.2 A
Power consumption
20 W
Supply voltage
220 V
Country of origin
China

Production. Usually 7–14 business days after you approve the quotation and pay. Made-to-specification items are confirmed in the quotation.

Freight. Not charged at checkout. A manager quotes air and sea freight to your port or airport, and nothing ships until you approve the price and the freight.

To North America. From approval and payment to the destination port or airport: air 14–24 days, sea 32–60 days. Estimates, not guarantees.

Terms. EXW Ningbo or FOB Ningbo Port; CIF on request. The agreed term is written on the Proforma Invoice.

Full shipping policy

Your cart
Variant Variant total Quantity Price Variant total
30 NmD300-04906
30 NmD300-04906
$25.06/ea
$0.00
$25.06/ea $0.00

Didn't Find What You're Looking For?

Get a Personalized Quote from Our Team
Provide us with your specific requirements, technical specifications, and parameters. Our team of experts will carefully evaluate your needs and select the most suitable equipment for you, ensuring the best possible timeframe and competitive pricing.