Construction
Parts and materials
Clamp-type repair couplings are designed to repair leaks (fistulas) and local damages (including cracks), as well as for pipe connections during repair and restoration works on water supply and sewerage pipelines made of steel, cast iron, PVC, polyethylene, asbestos cement and chrysotile cement. Connection is carried out by compression method due to tightening of bolts and pressing the inner surface of the coupling to the outer surface of the pipe. The clamp type repair coupling can be used even in the presence of pressure in the pipeline, which allows to speed up the repair and restoration work.
Dimensions of repair couplings DNOVA CCR14E(2pc)
| DN | Dmin | Dmax | B | L | Weight |
| 100 | 107 | 119 | 246 | 225 | 11.5 |
| 100 | 116 | 128 | 246 | 225 | 12.3 |
| 150 | 157 | 171 | 291 | 225 | 14 |
| 200 | 219 | 226 | 352 | 310 | 26.5 |
| 250 | 270 | 276 | 420 | 310 | 36.8 |

Sketch of overall dimensions of repair couplings DNOVA CCR14E(2pc)
Design and materials of repair couplings DNOVA CCR14E(2pc)
| № | Part name | Material of manufacture |
| 1 | Case | Cast iron GGG50 |
| 2 | Sealer | EPDM |
| 3 | Bolt | Galvanized steel |
| 4 | Nut | Galvanized steel |

Sketch of design and materials of repair couplings DNOVA CCR14E(2pc)
Production. Usually 7–14 business days after you approve the quotation and pay. Made-to-specification items are confirmed in the quotation.
Freight. Not charged at checkout. A manager quotes air and sea freight to your port or airport, and nothing ships until you approve the price and the freight.
To North America. From approval and payment to the destination port or airport: air 14–24 days, sea 32–60 days. Estimates, not guarantees.
Terms. EXW Ningbo or FOB Ningbo Port; CIF on request. The agreed term is written on the Proforma Invoice.
Total items
Product subtotal